eFORCE Consultancies Group

Toronto
Cairo
Abu Dhabi
Dubai
eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group
Strengthening design due to change in function or addition of loads
eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group eFORCE Consultancies Group
Projects Details
  • Strengthening design for the main beams supporting the stadium (motor racing circuit main grand stand) in Abu Dhabi, Formula One, Yas Island. with Tilke Consultant, Cebarco WCT contracting.
  • Strengthening design of concrete slabs at Bab Al Qasr Hotel and serviced apartments, Abu Dhabi for Nurol L.L.C. and Jacobs.
  • Strengthening design of existing columns due to change in loads for Hotel building at AL Barsha for Mohamed Bin Haider Group and Golden Planners Consultant.
  • Strengthening of existing slab due to additional loads at Trident Tower, Jumeirah Lakes Tower, for Safeer Engineering Consultant and Fix Concrete Technology.
  • Strengthening design of existing slab due to additional loads at Nation Towers, Abu Dhabi, for NPC-Arabtec JV and KEO International Consultant.
  • Strengthening design of existing beams due to removal of two columns at existing Mosque for extension of the Mosque, Abu Dhabi, with Abr al Khaleej contracting and APG consultant.
  • Assessment of the structural system of Mirdif building with Saleh Construction Co. L.L.C., Dubai
  • Strengthening design of roof slabs and beams at Sheraton Cornich Abu Dhabi.
  • Strengthening design of Jumeirah Mosque for Gargash Group, Dubai
  • Rehabilitation design of the existing 3rd floor at Holiday Inn Sharjah to add new Wedding Hall at the roof, with Golden Planner Consultants and Mohamed Omar Bin Haider group, Sharjah.
  • Strengthening design of Al Hilal Bank branch, Sharjah with BDS.
  • Rehabilitation design of roof slab to add cafeteria on top of it at the American University in Sharjah.
  • Strengthening design of Dubai International Financial Center (DIFC) due to additional loads on the landscape area.
  • Strengthening of the transfer slab at Al Manarah Tower at Business bay due to addition of loads, Dubai
  • Strengthening design of long (slender) column at Al Mahasna to avoid future buckling for Trans emirates Contracting, Dubai.
  • Structural modifications in Andalusia Beach Palace, Abu Dhabi for the office of the president. 2006. with Heberger Engineering consultants and Scan construction.
  • Modification of Kitchen block to be accommodation area for H.H. Sheikh Khalifa Bin Zaid Residential Complex, Jebel Hafeet, Al Ain with Al Salaam Consulting office and the presidential affairs.
eFORCE firms
eFORCE Engineering Consultancies
Dubai - UAE
eFORCE Inspection Consultancies
Abu Dhabi - UAE
eFORCE Canada
Toronto - Canada
eFORCE Technical Consultancies
Dubai - UAE
eFORCE Scientific Consultancies
Dubai - UAE
AB Engineering Consultant
Cairo - Egypt
eforce-logo